Skip to main content

COQUI MALACHOWSKA COQUI

Sustainable was yesterday — regenerative is the future!

We have been desig­ning inno­va­ti­ve, CLI­MA­TE-POSI­TI­VE, CIR­CU­LAR and RESI­LI­ENT cities for over 20 years.
Our focus is on buil­ding in exis­ting con­texts and imple­men­ting the PRIN­CI­PLES OF THE SPON­GE CITY.
Vibrant spaces that streng­then the COM­MU­NI­TY and shape the VEGE­TA­TI­ON OF THE FUTURE are the goal of our inte­gra­ted plan­ning.

APPROACH

The essence of our design phi­lo­so­phy is based on the idea of desig­ning pro­jects not for their own glo­ry, but for the peo­p­le who will dwell and inter­act in the open spaces we design. By taking the approach of first put­ting the pro­ject into dia­lo­gue with its sur­roun­ding con­text and allo­wing it to unfold in that inter­ac­tion, we stri­ve to design open spaces that not only ser­ve their pur­po­se, but rai­se the qua­li­ty of life of tho­se who use them in a sub­stan­ti­al way. For us, sus­taina­bi­li­ty is not just a word, but an atti­tu­de that requi­res con­stant, sen­si­ti­ve con­side­ra­ti­on and com­plex plan­ning.

SUSTAINABILITY

The pur­su­it of qua­li­ty of life and ful­fill­ment is at the core of our gui­ding prin­ci­ples and is roo­ted in the expres­si­on of com­pre­hen­si­ve and sus­tainable design. The key fac­tor is not only the moment of com­ple­ti­on, but espe­ci­al­ly the impact of the pro­ject over the cour­se of time. Doing it jus­ti­ce, we set in each pro­ject per­so­na­li­zed accents that are inten­ded to crea­te an increase in value. In addi­ti­on to social sus­taina­bi­li­ty, we also see natu­re and cul­tu­re as part­ners in our work. We see it as our respon­si­bi­li­ty to pre­cis­e­ly defi­ne the indi­vi­du­al role as well as the rela­ti­onship bet­ween natu­re and cul­tu­re in each pro­ject.

MILESTONES

In the office

CREATE SOMETHING TOGETHER

The gui­ding idea of our team­work in the land­scape archi­tec­tu­re office includes coll­ec­ti­ve crea­ti­on. We do not act alo­ne, but see our­sel­ves as part of an over­all struc­tu­re in which we share a pen with the cli­ent, plan­ning part­ners and respon­si­ble agen­ci­es. This sym­bio­tic dyna­mic enables us to work tog­e­ther, to com­bi­ne our exper­ti­se and thus to achie­ve coher­ent results. Our dai­ly office life is cha­rac­te­ri­zed by dis­cur­si­ve and equal pro­ces­ses. The deve­lo­p­ment of ide­as, the exch­an­ge of opi­ni­ons and the strugg­le for the best solu­ti­ons are essen­ti­al ele­ments of our dai­ly work. A non-hier­ar­chi­cal dis­tri­bu­ti­on of dis­cur­si­ve power makes it pos­si­ble to exploit crea­ti­ve poten­ti­al and deve­lop mul­ti-laye­red approa­ches.

Agnieszka Adamiec

Matthias Briesenick

Joerg Coqui

Emilian Kalkandzhiev

Immanuel Kasper

Izabela Malachowska-Coqui

Ellen Scharf

Form­er­ly:

Jose Are­n­ci­bia | Marie Bal­le | Bar­tek Banach | Zuzan­na Bart­mann | Rapha­el Bau­mann | Dri­ni Bera­ti | Jose Bigott Lopez | Caro­li­ne Boit­te | Katar­zy­na Chro­mińs­ka | Ste­fan Cich­osz | Sophie Coqui | Duy­gu Demir | Mar­ta Dobrzańs­ka | Jen­ni­fer Döring | Domi­ni­ka Droz­dows­ka | Tai­na Dyck­hoff | Ula Elz­ne­ro­wicz | Jan Fąfer­ko | Mar­ta Fal­bo­gows­ka | Tho­mas Fraed­rich | Céli­en Frai­nier | Mał­gorza­ta Fur­tas | Mag­da­le­na Gło­wa­cka-Giroux | Ela Grud­ziews­ka-Klick | Vio­la Hell­wag | Mał­gorza­ta Hen­drix | Rabea Hes­se | Mari­us Hüb­ner | Yvette Jagod­ka | Ralf Kam­mey­er | Yuli­ya Kavun | Sebas­ti­an Koch | Jakub Kor­fan­ty | Andrea Lech­te | Qi Liu | Miłosz Lisiecki | Alfon­so Loza­no | Pau­li­na Lukars­ka | Stef­fen Lux | Dana Mat­schek | Ewa Maty­je­wicz | Syl­wia Mazu­rek | Jas­mi­na McKen­na | Mał­gorza­ta Młyńs­ka | Mar­ta Migaj | Ama­lia Miran­da | Maria Moussong | Anja Mül­ler | Arash Naja­fi­da­sh­t­a­peh | Marek Ory­wał | Nata­lia Pahu­ta | Mał­gorza­ta Pawło­wicz | Mah­sa Pei­gan | Anna Rem­blews­ka | Ines Roth | Alex­an­der Rothert | Ludo­vica Rum­e­ni | Moni­ka Ser­a­fin | Katar­zy­na Siko­ra | Yana Simit­chiys­ka | Mag­da Sitek | Piotr Sosiń­ski | Luka­sz Spra­da | Nata­lia Stańc­zyk | Kat­rin Staiger | Mathä­us Steu­rer | Han­na Szu­mi­las | Michał Wasi­le­wicz | Hele­na Wil­son | Bar­to­sz Wojciech­ow­ski | Joan­na Woj­to­wicz | Gabi Zim­mer

AWARDS

2025

PHY­SICS INSTI­TU­TE:

Award in the cate­go­ry “Matu­ri­ty  Exami­na­ti­on — Pro­jects 20 years and older” at the Ger­man land­scape archi­tec­tu­re award 2025.

GAIL­LARD­STRAS­SE 28:

7th place on the short­list for the Flat Roof Con­test 2025 (Flach­dach-Con­test).

LANDS­BER­GER ALLEE 52:

8th place on the short­list for the Flat Roof Con­test 2025 (Flach­dach-Con­test).

2024

ST. URSU­LA ELE­MEN­TA­RY SCHOOL:

Win­ner of the REGE­NI­AL! pro­ject com­pe­ti­ti­on, which awards pio­nee­ring spon­ge city pro­jects.

LANDS­BER­GER ALLEE 52, GAIL­LARD­STRAS­SE 28, BER­NAU­ER STRASSE 26&34, PHY­SIK INSTI­TUT:
 
Nomi­na­ted for the REGE­NI­AL! pro­ject com­pe­ti­ti­on for spon­ge city pro­jects
 
 

2021

GLO­RIA BER­LIN:

DGNB Pla­ti­num cer­ti­fi­ca­ti­on, making it the worl­d’s first lis­ted buil­ding to recei­ve this honour.

> Go to pro­ject

2020

GEIS­BERG­STRAS­SE:

DGNB cer­ti­fi­ca­te in Gold, tog­e­ther with O&O Bau­kunst.

> Go to pro­ject

GEIS­BERG­STRAS­SE:

GOLD in the ‘Resi­den­ti­al’ cate­go­ry at the inter­na­tio­nal pro­per­ty award FIAB­CI Prix d’Ex­cel­lence Ger­ma­ny.

> Go to pro­ject

BOU­CHÉ GAR­DENS:

SIL­VER in the ‘Resi­den­ti­al’ cate­go­ry at the inter­na­tio­nal pro­per­ty award FIAB­CI Prix d’Ex­cel­lence Ger­ma­ny.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Cer­ti­fi­ca­te for the best tou­rist attrac­tion in the ran­king of the por­tal’s rea­ders
www.Dzieckowpodróży.pl

> Go to pro­ject

WEHRHAN­CEN­TER DÜS­SEL­DORF:

Nomi­na­ted for the City of Düs­sel­dorf Archi­tec­tu­re Pri­ze in col­la­bo­ra­ti­on with O&O Bau­kunst.

2019

Iza­be­la Malachows­ka-Coqui nomi­na­ted for the elec­tion of the most influ­en­ti­al peo­p­le of the last 25 years for Polish archi­tec­tu­re and its mar­ke­ting.

2015

EDGE HOUSE:

Nomi­na­ted for the Mies van der Rohe Award.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Crea­ted in Pol­and Super­brands Cen­trum Nau­ki Koper­nik recei­ves the title of one of the stron­gest ‘brands’ on the Polish mar­ket in 2013/14 (lei­su­re cate­go­ry) and 2014/15.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Qua­li­ty cer­ti­fi­ca­te from the users of the TRI­P­AD­VI­SOR por­tal.

> Go to pro­ject

2014

EDGE HOUSE:

INTER­NA­TIO­NAL PRO­PER­TY AWARD with Gar­den Rooms Best Archi­tec­tu­re Sin­gle Resi­dence Pol­and.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Nomi­na­ted for the title ‘Best Qua­li­ty 2014’ at the Qua­li­ty Inter­na­tio­nal QI 2014.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Award­ed by the Minis­try of Deve­lo­p­ment and Infra­struc­tu­re as an exem­pla­ry buil­ding in the con­text of its sur­roun­dings.

> Go to pro­ject

METRO­POL PARA­SOL:

CIVIC TRUST AWARD.

> Go to pro­ject

2013

CEN­TRUM NAU­KI KOPER­NIK:

Nomi­na­ted for the Mies van der Rohe Award.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Award for the best tou­rism pro­duct in the Mazo­vi­an Voi­vo­de­ship.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK

Award of the ‘More Beau­tiful Pol­and’ move­ment.

> Go to pro­ject

METRO­POL PARA­SOL:

Nomi­na­ted and fina­list at the Mies van der Rohe Award.

> Go to pro­ject

METRO­POL PARA­SOL:

URBAN INTER­VEN­TI­ON AWARD.

> Go to pro­ject

COM­FORT­ZO­NE:

Kul­tur- und Krea­tiv­pi­lo­ten Deutsch­lands — the COM­FORT­ZO­NE pro­ject by COQUI MALACHOWS­KA COQUI with Mathi­as Knig­ge was among 565 ent­ries invi­ted to the sel­ec­tion inter­views for the best.

> http://www.kultur-kreativpiloten.de/

2012

METRO­POL PARA­SOL:

Red­dot Award 2012, win­ner best of the best.

> Go to pro­ject

METRO­POL PARA­SOL:

DAM PRI­ZE FOR ARCHI­TEC­TU­RE IN GER­MA­NY 2012, which hono­urs the 22 best buil­dings in/from Ger­ma­ny in 2012/13.

> Go to pro­ject

METRO­POL PARA­SOL

AIT Award 2012 glo­bal Award for the very best in Inte­ri­or and Archi­tec­tu­re (Cate­go­ry Public Buil­ding).

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Spe­cial award Zycie w Archi­tek­tur­ze VII for the best cul­tu­ral buil­ding in Pol­and 2000–2012 , Minis­try of Cul­tu­re and Natio­nal Heri­ta­ge award.

> Go to pro­ject

2011

CEN­TRUM NAU­KI KOPER­NIK:

Com­pe­ti­ti­on ‘Pol­and beco­mes more beau­tiful’, cate­go­ry ‘Tou­rist objects’.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Pri­ze for the Park of Explo­rers in public vote Pri­ze of the Archi­tek­tu­ra maga­zi­ne in the cate­go­ry ‘Public Space’.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Most inte­res­t­ing buil­ding in the ‘cul­tu­re and sci­ence’ cate­go­ry in the Polish Archi­tec­tu­re 2050 public vote.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

For the ope­ning: Polish Busi­ness Award in the ‘Event of the Year’ and ‘Best Initia­ti­ve of the Year’ cate­go­ries.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Nomi­na­ted for the Radio Tok FM award.

> Go to pro­ject

2010

CEN­TRUM NAU­KI KOPER­NIK:

‘Buil­ding of the Year 2010’ award from the Minis­try of Con­s­truc­tion and Buil­ding Con­trol.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Вest urban pro­ject, win­ner of the pri­ze of the maga­zi­ne Еuro­build — Construction&Property.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Qua­drans Qul­tu­ry 2010 award — a quar­ter of cul­tu­re 2010 TVP INFO pri­ze for the most inte­res­t­ing cul­tu­ral event of the year.

> Go to pro­ject

CEN­TRUM NAU­KI KOPER­NIK:

Award of the RMF FM MocArt radio sta­ti­on in the ‘Event of the Year’ cate­go­ry.

> Go to pro­ject

2009

Ger­man-Polish Self-Govern­ment Pri­ze for Frankfurt/Oder and Slu­bice, pri­ze award­ed by the Foun­da­ti­on for Ger­man-Polish Coope­ra­ti­on. Hono­u­ring the coope­ra­ti­on bet­ween the two cities, espe­ci­al­ly in the con­text of the Future Con­fe­rence it spon­so­red in June of that year.

2008

The Ger­man-Polish IGOB (Inter­es­sen­ge­mein­schaft Eisen­bahn Ber­lin-Gor­zów — EWIV, with COQUI MALACHOWS­KA COQU as a coope­ra­ti­ve mem­ber) recei­ves the EEIG of the Year award out of 2000 appli­cants.

2007

METRO­POL PARA­SOL:

Nomi­na­ted for the Wall­pa­per Design Award.

> Go to pro­ject

2005

METRO­POL PARA­SOL:

Glo­bal Hol­cim Award Sus­tainable Deve­lo­p­ment, (400 appli­cants) Bron­ze for Pla­za de encar­na­ci­on, Seville, with J. May­er H.

> Go to pro­ject

SERVICES

The office­’s ser­vice spec­trum includes:

  • Pro­ject initia­ti­on, stra­te­gic con­sul­tancy, con­cepts and expert reports on cli­ma­te adapt­a­ti­on, rain­wa­ter manage­ment, social resi­li­ence and cir­cu­lar con­s­truc­tion
  • Site plan­ning for out­door spaces (accor­ding to the scope of ser­vices set out in the Ger­man Fee Struc­tu­re for Archi­tects and Engi­neers (HOAI) §15, Pha­ses 1–9, e.g. gar­dens, parks, town squa­res) and lis­ted buil­dings, among­st others
  • Land­scape plan­ning (in accordance with the scope of ser­vices set out in the HOAI §46)
  • Plan­ning and con­sul­tancy regar­ding the main­ten­an­ce, deve­lo­p­ment and res­to­ra­ti­on of gar­dens and green spaces

The main focu­ses are:

  • Out­door spaces for cul­tu­ral and edu­ca­tio­nal buil­dings
  • Out­door spaces for resi­den­ti­al and office buil­dings
  • Con­cepts for public spaces
  • Urban plan­ning


Other fields of work:

  • Inter­na­tio­nal coor­di­na­ti­on
  • Public enga­ge­ment, work­shops, faci­li­ta­ti­on
  • Con­fe­ren­ces, lec­tures, gui­ded tours, jury panels and tea­ching

Agnieszka Adamiec

Mgr. in Landscape Architecture, Mgr. in Business Administration

“It's not the buildings, it's the spaces between the buildings that are important.”
-Zaha Hadid

2022
Master's theses (landscape architecture and business administration)

Since 2018
Collaboration with COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture

2013-2018
Studied landscape architecture at the University of Natural Sciences in Warsaw (SGGW), the University of Kassel and the University of Natural Resources and Life Sciences Vienna

2011-2016
Studied Finance and Accounting at the Warsaw School of Economics (SGH)

Powered by

Matthias Briesenick

Cand. B. Sc. Landscape Architecture, Healthcare Specialist (Fachwirt für Gesundheitswesen)


Since 2024
Collaboration with COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture

Since 2021
Studying Landscape Architecture at Berliner Hochschule für Technik (BHT)

Powered by

Joerg Coqui

Dipl.-Ing. Landscape Architect

2025
German Landscape Architecture Award – Award in category ‘Graduation Projects – Projects 20 years and older’

2024
Winner of REGENIAL! – Berlin Prize for Water-Sensitive Planning

since 2011
Expert in sustainable outdoor facilities for the Federal Ministry of Construction

since 2011
Member of the Friends of the Federal Foundation for Building Culture (Förderkreis Bundesstiftung Baukultur)

2008
Visiting lecturer in urban design and landscape architecture, IFBau Stuttgart

2005-2007
Lecturer in landscape architecture, Potsdam School of Architecture

2004
Representative for Poland at the 9th International Architecture Biennale in Venice

2002
COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture Berlin / Warsaw

2000
Representative for Poland at the 1st Biennale of Landscape Architecture in Barcelona

2000-2001
Self-employed as freelance landscape architect

1996-1999
Project manager, from 1998 office manager with Prof. Stefan Tischer

1994-1995
Project manager in the landscape architecture offices of Prof. H. Langenbach, D. Schrickel and A. Röntz

1988-1994
Studied landscape architecture at the University of Applied Sciences Munich-Weihenstephan and the Faculty of Architecture of the Technical University of Gliwice (visiting student)

Powered by

Emilian Kalkandzhiev

B. Sc. Landscape Architecture
Cand. M. Sc. Historical Building Research and Preservation

„Space and light and order. These are the things you need as much as bread or a place to sleep“ Le Corbusier

Since 2024
Master's degree in Historical Building Research and Preservation at TU Berlin

Since 2023
Collaboration with COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture

2023
Student assistant at the landscaping company "JoMi" Berlin

2023
Recognition of the subject area "Landscape Architecture Design" Prof. Weidinger TU Berlin WiSe22/23

2019-2024
Studied landscape architecture at TU Berlin

Powered by

Immanuel Kasper

B.A. Architecture and urban design

„It gives me great pleasure to be able to help plan liveable spaces for people and nature at different scales, whether in urban planning design or in the concrete design of outdoor facilities.“

Since 2021
Studying sociology in the field of technical sciences with a minor in urban and regional planning at TU Berlin (B.A.)

Since 2020
Collaboration with COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture

2019-2024
Studied architecture and urban planning at the Potsdam University of Applied Sciences (B.A.)

2018-2019
Studied architecture at the TH Lübeck

Powered by

Izabela Malachowska-Coqui

Dipl.-Ing. Landscape Architect

2026
Visiting lecturer at the Academy of Fine Arts in Warsaw, Faculty of Design – Research platforms on climate adaptation

2025
German Landscape Architecture Award – Award in category ‘Graduation Projects – Projects 20 years and older’

2024
Winner of REGENIAL! – Berlin Prize for Water-Sensitive Planning

2019
Nominated for the award for the most influential figures in Polish architecture and its promotion over the last 25 years

since 2018
Member of the Association of Women in the Real Estate Industry (Frauen in der Immobilienwirtschaft e.V.)

2013-2018
Initiator and organizer of the WARSAW ARCHITECTURAL TALKS

2004
Representative for Poland at the 9th International Architecture Biennale in Venice

since 2003
Member of YPIN (Young Polish International Network)

since 2002
COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture Berlin / Warsaw

2000
Representative for Poland at the 1st Biennale of Landscape Architecture in Barcelona

1997-1998
Project manager at the planning office of Prof. J. Peters

1993-2002
Self-employed, office for planning and execution in Warsaw

1978-1993
Studied landscape architecture at the University of Life Sciences in Warsaw

Powered by

Ellen Scharf

Cand. M. Sc. Landscape Architecture

„I love the interplay between nature and the city. Sustainable solutions must be found so that this can be preserved for a long time to come. I would like to contribute to this.“

Since 2021
Master's degree in Landscape Architecture at the TU Berlin

Since 2020
Collaboration with COQUI MALACHOWSKA COQUI Urban Design Landscape Architecture

2018-2019
Student assistant at the Cassens and Siewert planning group

2016-2019
Bachelor's degree in landscape architecture at the Technical University of Berlin

Powered by

Kontakt

KONTAKT

BERLIN